1 مکانیک:: آزمایش دورهای
13.13 Periodic Puff Testing. A test in accordance with 10.4.15 shall be performed at 24-month intervals. The periodic test program shall include a functional test of all alarms, controls, and time delays.
واژگان شبکه مترجمین ایران