فارسی
1
عمران::
خط مبنا
Baseline readings should be obtained on critical elements to monitor defects and rate of decline.
A "baseline" risk assessment is initially conducted for the tunnel in its current condition (i.e.
For each mitigation scheme, risk should be recalculated using the same methodology and the same components considered for the baseline analysis.
The mitigated risk can be compared to the baseline risk as shown in Table 4.
For each mitigation scheme, risk should be recalculated using the same methodology and the same scenarios as for the baseline analysis.
واژگان شبکه مترجمین ایران
2
برق و الکترونیک::
خط مبنا
واژگان شبکه مترجمین ایران
3
عمومی::
مبنا
شبکه مترجمین ایران
4
عمومی::
خط انتهای زمین، شرایط مبنا
Run forwards to the baseline.At the cone, change movement to a side shuffle, and move sideways to the right across the baseline.
Remain facing forwards towards the baseline throughout the test.
With the tape mark a straight line two feet long on the floor as the baseline, and a measurement line perpendicular to the midpoint of the baseline extending two feet on each side.
Use the marker pen to indicate every half-inch along the measurement line - the point where the baseline and measuring line intersect is the zero point.
* procedure: The subject removes their shoes and sits on floor with the measuring line between their legs with the soles of their feet placed immediately behind the baseline, heels 8-12" apart.،return to baseline
واژگان شبکه مترجمین ایران